Cable-stayed bridge
Test
Client | |
---|---|
Bridge type | |
Erection method | |
Completed in | |
Location |
The bridge consists of 17-span continuous steel and pre-cast RC slab composite girders, with three center spans of the cable-stayed type. A steel and pre-cast RC slab composite girder was selected to minimize its own weight and shorten the construction period.
Test
Client | |
---|---|
Bridge type | |
Erection method | |
Completed in | |
Location |
Thu Thiem 2 Bridge over the Saigon River between District 1 and Thu Duc City opens to traffic Thursday. The 1.5-km, six-lane bridge links downtown and the Thu Thiem New Urban Area, designated as the new financial and innovative hub of the city.Constructed under the build-operate format, it cost VND3.1 trillion ($134.54 million), making it easily the most expensive of the city's numerous bridges.
Test
Client | |
---|---|
Bridge type | |
Erection method | |
Completed in | |
Location |